Related Articles
Latest Sea Jobs In Synergy Group- Philippines
As of 18 May 2020 CREW REQUIREMENTS SYNERGYGROUP OPERATIONS, INC. IS NOW LOOKING FOR THE FOLLOWING: FOR BULK CARRIER (4) MASTER – CAPESIZE/ULTRAMAX/SUPRAMAX (4) CM – 1 KAMSARMAX/1 PANAMAX/1 SUPRAMAX/1 CONTAINER (4) CHIEF ENGINEERS – 4 ME ENGINE (1 CAPE, 1 KAM, 2 SUPRA) (7) SECOND ENGINEERS – 3 ME ENGINE (1 CAPE, 1 KAM, […]
MARPOL 73/78 Annexes and Its Requirements
In this article all the information related to Marpol like why it was formed and the various Annexes that fall under it have been discussed. Marpol came into the power because of the serious concern related to the Marine pollution that was affecting both aquatic and human life. Let’s read about this interesting topic in much more detail. […]
MSC takes delivery of MSC Tessa, World Largest Ship
MSC Tessa, is now the world largest ship and was delivered to the shipping giant today. Ship is constructed by Chinese shipbuilder Hudong-Zhonghua Shipbuilding. MSC Tessa-World Largest Ship Facts small bulbous bow large diameter propeller air lubrication for less resistance with water hybrid scrubber Length 400 meters breath breath 61.5 meters Container carrying capacity 24116 […]